HomeAbout UsServicesProjectsBlogsContact Us
The Engine of the OT

Air Handling Units (AHU)

The AHU is the massive engine that sitting outside the OT. It cools, dehumidifies, and multi-filters the air before it reaches the surgical suite. We manufacture double-skin thermal break units that guarantee absolute climate control.

System At a Glance
  • Double-Skin Thermal Break
  • High Efficiency EC Plug Fans
  • UVGI Coil Sterilization
  • Class 100 / ISO 5 Compliant
System Infrastructure

Console Configurations

Every configuration is precision-manufactured and modularly designed to fit your exact demands.

Cleanroom Hygienic AHU

Cleanroom Hygienic AHU

The mandatory base system for OTs and ICUs. Built specifically for zero microbial growth with smooth internal surfaces.

Features double-skin PUF insulated panels to prevent thermal leakage and multi-stage filtration banks.

Treated Fresh Air Unit (TFA)

Treated Fresh Air Unit (TFA)

Critical for maintaining positive pressure and flushing anesthetic gases. Utilizes 100% outside air with zero recirculation.

Equipped with massive cooling coils to handle the immense thermal load of raw outdoor air.

Internal Engineering

Anatomy of Safety

Our systems are governed by extreme safety protocols to ensure zero-defect, fail-safe operation.

Double-Skin PUF Housing

Cabinets separated by injected high-density PUF insulation to ensure zero temperature transfer and zero sweating.

  • Eliminates Condensation
  • High-Density Insulation

EC Plug Fan Technology

Direct-driven motors that operate silently and automatically adjust speed via VFD to maintain exact room pressure.

  • Massive Static Pressure
  • Energy Efficient & Silent

UVGI Coil Sterilization

Ultraviolet lamps pointing at cooling coils destroy mold and biofilm before air enters the ductwork.

  • Destroys Mold & Biofilm
  • Prevents Sick Building Syndrome
Where We Install

Key Applications

Modular Operation Theatres

Modular Operation Theatres

Intensive Care Units

Intensive Care Units

IVF & Fertility Labs

IVF & Fertility Labs

Isolation Wards

Isolation Wards

Why Choose MedGenz?

We don't just supply equipment; we engineer and execute complete turnkey hospital ecosystems.

Turnkey HVAC

Turnkey HVAC

By providing end-to-end HVAC solutions, we eliminate delays and ensure strict quality control.

ISO & CE Certified

ISO & CE Certified

Our products strictly adhere to ISO 9001:2015 standards for medical-grade outcomes.

Pan-India Execution

Pan-India Execution

Our engineering teams travel directly to your site anywhere in the country.

Lifetime Support

Lifetime Support

We provide comprehensive maintenance and validation services for the life of the plant.

"
Quick Case Study

Stabilizing OT Humidity in Maharashtra

A surgical center near the coast faced extreme humidity, fogging microscopes and risking contamination.

The Solution: Installed a Double-Skin Thermal Break DX AHU with wrap-around heat pipes. 50% ± 5% Relative Humidity maintained flawlessly.

Technical Specifications

Cabinet ConstructionDouble Skin with 43mm/50mm PUF insulation
Frame ProfileExtruded Aluminum with Thermal Break
Fan TechnologyDirect Driven EC Plug Fans
Coil TypeCopper Tubes with Hydrophilic Aluminum Fins

Frequently Asked Questions

Technical details regarding our Air Handling Units (AHU).

Difference between AHU and LAF?

AHU is the external 'engine' that cools and filters air; LAF is the internal 'delivery' plenum.

Why use 'Double Skin'?

To prevent external condensation (sweating) which breeds rust and mold.

What is UVGI?

Ultraviolet lights that sterilize the cooling coils to kill mold and bacteria.

Our Certifications & Compliance

MedGenz is certified and trusted by leading regulatory bodies for healthcare safety.

Udhyam

Udhyam

CE Certified

CE Certified

ISO 9001

ISO 9001

Our Valuable Clients

Trusted by leading healthcare institutions across India. Drag to explore.

Hospital Client 1
Hospital Client 2
Hospital Client 3
Hospital Client 4
Hospital Client 5
Hospital Client 6
Hospital Client 7
Hospital Client 8
Hospital Client 9
Hospital Client 10
Hospital Client 11
Hospital Client 12
Hospital Client 13
Hospital Client 14
Hospital Client 15
Hospital Client 16
Hospital Client 17
Hospital Client 18
Hospital Client 19
Hospital Client 20
Hospital Client 21
Hospital Client 22
Hospital Client 23
Hospital Client 24
Hospital Client 25
Hospital Client 26
Hospital Client 27
Hospital Client 28
Hospital Client 29
Hospital Client 30
Hospital Client 31
Hospital Client 32
Start Your Project

Ready to Upgrade Your Hospital Infrastructure?

Partner with MedGenz for reliable, international-grade Operation Theatres, ICU setups, and precise Medical Gas Pipeline Systems.

Air Handling Units (AHU) | Modular OT Specialists | MedGenz