
Class 100 Modular OT Excellence
Turnkey Surgical Infrastructure
Project Brief
A landmark project for a premier multi-specialty hospital in Delhi NCR requiring the construction of two ultra-sterile, Class 100 Modular Operation Theatres from a bare shell.
The Challenge
The facility required absolute sterility for transplant surgeries, with a strictly defined timeline of 45 days. The existing building structure had low ceiling heights, complicating the installation of massive AHU ducting and LAF plenums.
Our Solution
MedGenz engineered a customized low-profile HVAC ducting network and utilized high-density SS-304 wall panels with antibacterial silicone sealing. We integrated a centralized Surgeon Control Panel to automate the environment monitoring.
Technical Highlights
Have a Project
In Mind?
Whether it's a new facility or upgrading existing infrastructure, MedGenz has the expertise to deliver on time and within budget.
Ready to Upgrade Your
Hospital Infrastructure?
Partner with MedGenz for reliable, international-grade Operation Theatres, ICU setups, and precise Medical Gas Pipeline Systems.